Opportunities

Connected. Committed. Constructors.

Click below for an updated procurement schedule!

Procurement Schedule

 

ACCESS CURRENT BID OPPORTUNITIES

Questions? Email: [email protected]

Future Construction Subcontract Opportunities

SPC is seeking to engage firms interested in participating on TxDOT’s SE Connector Design Build Project. Potential scopes of work include (but are not limited to):

  • Aggregates and paving
  • Aggregates Materials
  • Asphalt Hot Mix
  • Asphalt Hot Mix Hauling
  • Asphalt Milling
  • Wet Haul Attenuators (PM Only)
  • Base Supplier (Agg)
  • Bedding
  • Bridge Expansion Joint Materials
  • Cement
  • Cement Haul
  • Cement/flyash haul
  • Concrete – Pumping
  • Concrete Admixtures
  • Concrete Waterproofing
  • Demolition – Concrete Pavement
  • Demolition – Saw Cut
  • Drain Materials
  • Drainage Sub
  • Dumpsters
  • Existing Structures Rehabilitation
  • Fence and Railing
  • Final Striping
  • Flatwork SUB
  • Flyash
  • Foundation Perm Casing & Foundation NDT
  • Foundation Rebar Accessory
  • Grading – Geotextile Materials
  • Grading – Lime Materials
  • Grooving and Grinding Pavement
  • Guardrail (PM + Install) and Attenuators (Install only)
  • Medical Services
  • Misc Pavement Subs
  • Painting / Coatings / Waterproofing
  • PC FTW Structures Materials
  • Post Tension Sub
  • Pre-Cast Concrete Girder Materials
  • Pre-Cast Concrete Materials
  • Project Limit Signs
  • PVC / HDPE Materials
  • Quality Control
  • RCP Materials/Prcast box Culverts
  • Ready Mix
  • Recycling (steel scrap)
  • Reinforcing – Wire Mesh
  • Reinforcing Materials (GRP)
  • Reinforcing SUB
  • Pavement Crushing (Onsite)
  • Saw and Seal Pavement
  • Sewer line relocation
  • SIP Metal Decking Materials
  • SIP Precast Deck Panels Materials
  • Site Security – Guard
  • Slip Forming Barrier
  • Sound Wall Materials (GRP)
  • Tack Coat (Asphalt hot materials)
  • Telecom Relocation
  • Temp Striping
  • Temp Wire Wall Materials
  • Testing Equipment (Aggregates and Paving)
  • Trucking-Flat bed
  • Trucking- Dirt haul
  • Concrete Sidewalk Walls Sub
  • Sound Wall Sub
  • Walls – Temp Soil Nail Sub
  • Emergency Utility Repair
  • Electrical Relocation
  • Potholing
  • Water line relocation
  • Water Materials
  • Welder

Working With SPC

We evaluate companies on different criteria based on specific project requirements. This may include, but is not limited to:

  • Safety performance
  • Proven quality
  • Certification
  • Insurance and bonding capability
  • Years in business
  • Reputation
  • Past performance with Project Team Members or Client
  • Value-added products or services
  • On-time performance

South-Point Constructors is committed to meeting or exceeding TxDOT’s Disadvantaged Business Enterprise (DBE) goals of 23% professional services and 14.5% construction participation on this project through assisting interested DBEs in obtaining bonding, lines of credit or insurance; providing interested DBEs information related to the plans, specifications and requirements for work to be subcontracted or supplied by these DBEs; assisting interested DBEs in obtaining necessary equipment, supplies, materials or related assistance or services; and sub-dividing bid items into economically feasible work units to DBEs every advantage to quoting the project.

South-Point Constructors is an Equal Opportunity Employer. Employment decisions are made without regard to race, color, religion, national or ethnic origin, sex, sexual orientation, gender identity or expression, age, disability, protected veteran status or other characteristics protected by law.